|
OATEY®
SOLAR FLASHING
Used with the 3" or 4-1/2" Fast
Jack. No caulk design. Available in box quantities of 12.
A Properly Installed Flashing is imperative on any installed
FastJack to insure all structural attachments provide a water-tight
seal.
Proper Oatey Flashing installation
The
correct placement of a flashing is to cut in the area where the lag bolt
is engaged to the roof. This method keeps water from entering the space
underneath the flashing. By keeping the are where the lag bolt hole is
made, there is virtually no opportunity for roof leaks.
Use the Flashing Template to quickly install
your flashings.
Incorrect Oatey Flashing
Installation
The
incorrect placement of a flashing is assuming that you do not need to cut into
the roofing material. Notice when the flashing is not cut into the shingle it is
very easy for water to flow under the space beneath the flashing and into the
lag bolt connection.
Be sure to use the flashing template for an
easy shortcut when installing your flashings.
|